Annual Production Survey 2024
EAP 2024
EAP 2024
Consulter
Sommaire
Actualité et ponctualité
Timeliness and TP2. Time lag - final results for U
At European level, the first results are disseminated 6 months after the end of the reference period ; at national level, 11 months after.
The 5-month time lag between the two releases is explained by the broader scope of the release nomenclature at national level than at European level.
Morover, there is only one (definitive) French release, whereas june relase is definitive (folowed by data review five month later).
Punctuality and TP3. Punctuality - delivery and publication for U
The timetable is generally respected. At European level, deadlines are always met.