Annual production survey 2021 
               
                  EAP 2021
               
         
         
      EAP 2021
Consulter
      Sommaire
               
            Actualité et ponctualité
Timeliness and TP2. Time lag - final results for U
At European level, the first results are disseminated 6 months after the end of the reference period ; at national level, 8 months after.
The 2-month time lag between the two releases is explained by the broader scope of the release nomenclature at national level than at European level.
Punctuality and TP3. Punctuality - delivery and publication for U
The timetable is generally respected. At European level, deadlines are always met.
 
