Annual production survey 2020 
               
                  EAP 2020
               
         
         
      EAP 2020
Consulter
      Sommaire
               
            Actualité et ponctualité
Timeliness and TP2. Time lag - final results for U
At European level, the first results are disseminated 6 months after the end of the
                              reference period ; at national level, 8 months after.
                              The 2-month time lag between the two releases is explained by the broader scope of
                              the release nomenclature at national level than at European level.
Punctuality and TP3. Punctuality - delivery and publication for U
The timetable is generally respected. At European level, deadlines are always met.
 
