2014- n° 274In the third quarter of 2014, dwellings maintenance and improvement work price index
are flat Dwellings maintenance and improvement price index - 3rd quarter of 2014
In the third quarter of 2014, dwellings maintenance and improvement work price index (IPEA) is flat like in the previous quarter. Over a year, IPEA rose by 0.7%, while “maintenance and improvement cost index” (BT50) increased this quarter (+0.3%) and over a year (+0.2%).
In the third quarter of 2014, dwellings maintenance and improvement work price index (IPEA) is flat like in the previous quarter. Over a year, IPEA rose by 0.7%, while “maintenance and improvement cost index” (BT50) increased this quarter (+0.3%) and over a year (+0.2%).
Prices increased in the second quarter in plastering (+0.5%), metal joinery (+0.3%) and wood and PVC joinery works (+0.3%).
Prices are virtualy flat in roofing activities (–0.1%), in masonry works and building structural works (–0.1%), in plumbing (–0.1%) and in heat and air-conditioning installation (–0.1%).
However, prices declined slowly in electricity (–0,2 %) and in painting and floor and wall covering (–0.2%).
tableauTABIPEA – Dwellings maintenance and improvement price and cost index (IPEA et BT50)
Change (%) | ||||
---|---|---|---|---|
Weights | 2014Q3 | Q/Q-1 | Q/Q-4 | |
IPEA | 1 000 | 105.6 | + 0.0 | + 0.7 |
Masonry works and building structural works | 169 | 104.2 | - 0.1 | + 1.4 |
Painting and floor and wall covering | 169 | 102.7 | - 0.2 | + 0.2 |
Wood and PVC joinery works | 155 | 108.1 | + 0.3 | + 1.1 |
heat and air-conditioning installation | 107 | 107.5 | - 0.1 | + 0.9 |
Plumbing | 101 | 110.0 | - 0.1 | + 0.5 |
Roofing activities | 94 | 104.3 | - 0.1 | - 0.7 |
Electrical installation | 92 | 104.0 | - 0.2 | + 0.5 |
Metal joinery works and ironwork | 63 | 107.2 | + 0.3 | + 0.9 |
Plastering | 50 | 102.1 | + 0.5 | + 1.8 |
BT 50 | 1 000 | 107.0 | + 0.3 | + 0.2 |
- Raw data, weights and reference 100 in 2010
- Sources: INSEE, Ministry of Ecology
tableauTABREV – Revision of each dwellings maintenance and improvement work price indices (in points)
2014Q2 | |
---|---|
IPEA | - 0.1 |
Masonry works and building structural works | /// |
Painting and floor and wall covering | - 0.4 |
Wood and PVC joinery works | - 0.2 |
heat and air-conditioning installation | + 0.1 |
Plumbing | + 0.1 |
Roofing activities | - 0.4 |
Electrical installation | /// |
Metal joinery works and ironwork | /// |
Plastering | - 0.1 |
- How to read it: the change of the index of roofing activities between the fourth quarter of 2013 and the first quarter of 2014 published in May 2014 is updated down by –0.4%.
- Source: INSEE
graphiquegraphipeaUK – Dwellings maintenance and improvement price and cost index (IPEA et BT50)
graphiqueGraphFamilleUK – Quarterly contibutions in dwellings maintenance and improvement price indexes (in %)
graphiqueGraph6aUK – Main dwellings maintenance and improvement price indexes
graphiqueGraph6bUK – Main dwellings maintenance and improvement price indexes
graphiqueGraph6cUK – Main dwellings maintenance and improvement price indexes
Documentation
Methodology (pdf,93 Ko)