2015- n° 292In the third quarter of 2015, dwellings maintenance and improvement work prices were
flat Dwellings maintenance and improvement price index - 3rd Quarter of 2015
In the third quarter of 2015, dwellings maintenance and improvement work price index (IPEA) was stable (after +0.1% in the previous quarter). Over a year, it rose by 0.3%.
In the third quarter of 2015, dwellings maintenance and improvement work price index (IPEA) was stable (after +0.1% in the previous quarter). Over a year, it rose by 0.3%.
In the third quarter, prices were flat in plumbing, roofing activities, electrical installation and plastering and virtually flat in painting and floor and wall covering (–0.1%) and heat and air-conditioning installation (–0.1%). They decreased in wood and PVC joinery works (–0.3%), but they increased slightly in masonry works and building structural works metal joinery works (+0.2%) and in ironwork and in plastering (+0.2%).
graphiquegraphipeaUK – Dwellings maintenance and improvement work price and cost indices (IPEA and ICP 43BTR)
Producer cost index in specialised construction in existing buildings (ICP-43BTR) increased slightly in the third quarter of 2015 (+0.2%), and rose by 0.4% over a year.
tableauTABIPEA – Dwellings maintenance and improvement work price and cost index
Weights | 2015Q3 | Q/Q-1 | Q/Q-4 | |
---|---|---|---|---|
Dwellings maintenance and improvement work price index (IPEA) | 1 000 | 105.9 | 0.0 | +0.3 |
Masonry works and building structural works | 169 | 104.4 | +0.2 | 0.0 |
Painting and floor and wall covering | 169 | 102.3 | -0.1 | -0.4 |
Wood and PVC joinery works | 155 | 108.9 | -0.3 | +0.8 |
Heat and air-conditioning installation | 107 | 107.9 | -0.1 | +0.6 |
Plumbing | 101 | 110.6 | 0.0 | +0.6 |
Roofing activities | 94 | 104.5 | 0.0 | +0.1 |
Electrical installation | 92 | 104.6 | 0.0 | +0.5 |
Metal joinery works and ironwork | 63 | 108.5 | +0.2 | +1.2 |
Plastering | 50 | 102.4 | 0.0 | +0.3 |
Producer cost index in specialised construction in existing buildings (ICP-43BTR) | 1 000 | 105.6 | +0.2 | +0.4 |
- In %, raw data, base and reference 100 in 2010
- Source: INSEE
tableauTabREV – Revision of each dwellings maintenance and improvement work price indices (in points)
2015Q2 | |
---|---|
IPEA | /// |
Masonry works and building structural works | -0.1 |
Painting and floor and wall covering | -0.1 |
Wood and PVC joinery works | +0.1 |
Heat and air-conditioning installation | /// |
Plumbing | -0.1 |
Roofing activities | +0.1 |
Electrical installation | /// |
Metal joinery works and ironwork | /// |
Plastering | -0.1 |
- How to read it: the change of the “Painting and floor and wall covering” price index between the first and the second quarter of 2015 is revised downward by 0.1 points. Published in August 2015 at 0.0%, it is now estimated at –0.1%.
- Source: INSEE
graphiqueGraph6aUK – Changes in dwellings maintenance and improvement work price indices
graphiqueGraph6bUK – Changes in dwellings maintenance and improvement work price indices
graphiqueGraph6cUK – Changes in dwellings maintenance and improvement work price indices
Documentation