In Q2 2025, production costs in construction were almost stable over a quarter and
rose by 1.3% over a year Costs of production indices in construction - second quarter 2025
In Q2 2025, the production costs in construction were almost stable over a quarter (+0.1% after +0.8% in the previous quarter). They slowed down in building construction (+0.3% after +0.6%): the sharp downturn in energy costs (-6.4% after +3.2%) and the slowdown in materials costs (+0.1% after +0.7%) were partially offset by a rebound in miscellaneous costs (+0.4% after -0.2%). Production costs fell back in civil engineering (-0.8% after +1.3%), due to the sharp downturn in energy costs (-13.2% after +9.2%) and, to a lesser extend, in materials costs (-1.5% after +1.9%). They slowed down in specialised construction works (+0.2% after +0.7%): specialised public works materials costs fell back (-0.1% after +2.5%) and renovation materials costs slowed down slightly (+0.1% after +0.2%).
Year on year, the production costs in construction slowed down slightly (+1.3% after +1.5%). They accelerated slightly in building construction (+1.2% after +1.0%) and in specialised construction works (+1.5% after +1.4%) and they slowed down in civil engineering (+0.5% after +1.9%).
In Q2 2025, the production costs in construction were almost stable over a quarter (+0.1% after +0.8% in the previous quarter). They slowed down in building construction (+0.3% after +0.6%): the sharp downturn in energy costs (-6.4% after +3.2%) and the slowdown in materials costs (+0.1% after +0.7%) were partially offset by a rebound in miscellaneous costs (+0.4% after -0.2%). Production costs fell back in civil engineering (-0.8% after +1.3%), due to the sharp downturn in energy costs (-13.2% after +9.2%) and, to a lesser extend, in materials costs (-1.5% after +1.9%). They slowed down in specialised construction works (+0.2% after +0.7%): specialised public works materials costs fell back (-0.1% after +2.5%) and renovation materials costs slowed down slightly (+0.1% after +0.2%).
Year on year, the production costs in construction slowed down slightly (+1.3% after +1.5%). They accelerated slightly in building construction (+1.2% after +1.0%) and in specialised construction works (+1.5% after +1.4%) and they slowed down in civil engineering (+0.5% after +1.9%).
tableauVariations in producer costs in construction
Heading | Weights | Q2 2025/ Q1 2025 | Q2 2025/ Q2 2024 |
---|---|---|---|
F Construction | 100.0 | 0.1 | 1.3 |
By NAF division: | |||
41.2 Construction of buildings | 7.2 | 0.3 | 1.2 |
42 Civil engineering | 19.3 | -0.8 | 0.5 |
43 Specialised construction works | 73.4 | 0.2 | 1.5 |
43BT Buildings | 63.8 | 0.3 | 1.5 |
43BTC New buildings | 24.2 | 0.2 | 1.1 |
43BTR Existing buildings | 39.6 | 0.3 | 1.7 |
43TP Specialised works for civil engineering | 9.6 | -0.1 | 1.5 |
By business sector: | |||
Buildings (41.2 + 43BT) | 71.0 | 0.3 | 1.5 |
Public works (42 + 43TP) | 29.0 | -0.5 | 0.9 |
- Source: INSEE.
tableauProduction costs in construction
Construction | Construction of buildings | Civil engineering | Specialised construction works | |
---|---|---|---|---|
2025-06 | 114.3 | 114.4 | 115.1 | 114.1 |
2025-05 | 114.1 | 114.2 | 115.2 | 113.8 |
2025-04 | 114.3 | 114.1 | 116.0 | 113.8 |
2025-03 | 114.2 | 114.0 | 116.3 | 113.7 |
2025-02 | 114.2 | 113.9 | 116.5 | 113.7 |
2025-01 | 114.1 | 113.8 | 116.2 | 113.5 |
2024-12 | 113.6 | 113.4 | 115.3 | 113.1 |
2024-11 | 113.3 | 113.2 | 115.3 | 112.8 |
2024-10 | 112.9 | 113.0 | 113.8 | 112.7 |
2024-09 | 112.9 | 113.0 | 114.3 | 112.5 |
2024-08 | 113.3 | 113.4 | 115.3 | 112.8 |
2024-07 | 113.1 | 113.2 | 115.2 | 112.6 |
2024-06 | 112.8 | 113.0 | 114.6 | 112.3 |
2024-05 | 112.8 | 113.0 | 115.0 | 112.2 |
2024-04 | 112.7 | 112.8 | 115.0 | 112.2 |
2024-03 | 112.6 | 112.7 | 114.5 | 112.1 |
2024-02 | 112.6 | 112.9 | 114.1 | 112.2 |
2024-01 | 112.3 | 112.6 | 113.9 | 111.9 |
2023-12 | 112.1 | 112.5 | 113.9 | 111.6 |
2023-11 | 112.2 | 112.4 | 114.9 | 111.5 |
2023-10 | 112.5 | 112.5 | 115.8 | 111.7 |
2023-09 | 112.5 | 112.5 | 115.3 | 111.8 |
2023-08 | 112.1 | 112.6 | 113.9 | 111.6 |
2023-07 | 111.7 | 112.2 | 113.4 | 111.3 |
2023-06 | 111.7 | 112.4 | 113.0 | 111.3 |
2023-05 | 111.6 | 112.3 | 113.7 | 111.0 |
2023-04 | 111.8 | 112.3 | 113.9 | 111.1 |
2023-03 | 111.5 | 112.2 | 113.2 | 110.9 |
2023-02 | 111.1 | 111.8 | 112.5 | 110.6 |
2023-01 | 110.5 | 110.6 | 112.6 | 109.9 |
2022-12 | 109.2 | 109.0 | 111.5 | 108.6 |
2022-11 | 109.4 | 109.0 | 111.9 | 108.7 |
2022-10 | 109.4 | 109.0 | 112.7 | 108.6 |
2022-09 | 109.1 | 108.7 | 113.6 | 108.0 |
2022-08 | 109.5 | 109.6 | 113.6 | 108.4 |
2022-07 | 109.4 | 109.2 | 113.8 | 108.2 |
2022-06 | 108.8 | 108.6 | 113.5 | 107.6 |
2022-05 | 107.8 | 108.0 | 111.9 | 106.7 |
2022-04 | 107.2 | 106.8 | 112.1 | 105.9 |
2022-03 | 105.8 | 105.3 | 109.4 | 104.9 |
2022-02 | 104.3 | 104.3 | 106.3 | 103.7 |
2022-01 | 103.5 | 103.5 | 105.4 | 103.0 |
2021-12 | 102.1 | 101.9 | 103.7 | 101.7 |
2021-11 | 102.1 | 101.9 | 103.9 | 101.7 |
2021-10 | 101.6 | 101.5 | 102.7 | 101.3 |
2021-09 | 101.1 | 101.1 | 101.6 | 100.9 |
2021-08 | 100.7 | 100.9 | 100.9 | 100.7 |
2021-07 | 100.3 | 100.6 | 100.3 | 100.3 |
2021-06 | 99.4 | 99.5 | 99.1 | 99.5 |
2021-05 | 99.0 | 99.0 | 98.5 | 99.1 |
2021-04 | 98.9 | 98.8 | 98.4 | 99.0 |
2021-03 | 98.8 | 98.8 | 98.0 | 99.0 |
2021-02 | 98.3 | 98.3 | 96.8 | 98.6 |
2021-01 | 97.7 | 97.7 | 96.1 | 98.2 |
graphiqueProduction costs in construction

- Source: INSEE.
tableauBreakdown of production costs in construction
Business sector | Production factor | Weights | Q2 2025/ Q1 2025 | Q2 2025/ Q2 2024 |
---|---|---|---|---|
Buildings (41.2 + 43BT) | Machinery for structural work in building construction | 1.6 | 0.5 | 0.7 |
Machinery for finishing work in building construction | 3.3 | -0.3 | 1.6 | |
Labour | 52.6 | 0.6 | 3.0 | |
Energy | 0.9 | -6.4 | -9.0 | |
Materials in construction of buildings | 16.1 | 0.1 | -0.2 | |
Materials in renovation of buildings | 13.7 | 0.1 | 0.1 | |
Miscellaneous costs | 9.5 | 0.4 | 0.5 | |
Transport | 2.2 | -0.9 | -1.9 | |
Public works (42 + 43TP) | Machinery | 19.8 | 1.4 | 1.0 |
Labour | 33.8 | 0.7 | 3.5 | |
Energy | 6.0 | -13.2 | -3.9 | |
Materials in civil engineering | 19.3 | -1.5 | -1.9 | |
Materials in specialised works for civil engineering | 9.7 | -0.1 | 0.8 | |
Miscellaneous costs | 3.8 | 0.4 | 0.5 | |
Transport | 5.9 | 1.6 | 1.7 | |
Waste | 1.7 | 0.2 | -0.1 |
- Note: the labour costs in construction changes are calculated using the labour cost index LCI – hourly costs in the construction sector. Further information about Labour cost index in industry, construction and services are available at the bottom of the publication webpage.
- Source: INSEE.
tableauProduction costs in buildings
Materials in construction | Materials in renovation | All buildings | Energy | Miscellaneous costs | |
---|---|---|---|---|---|
2025-06 | 117.3 | 117.7 | 113.7 | 110.5 | 113.5 |
2025-05 | 117.3 | 117.5 | 113.4 | 107.6 | 112.4 |
2025-04 | 117.2 | 117.4 | 113.4 | 109.7 | 113.7 |
2025-03 | 117.2 | 117.6 | 113.3 | 114.2 | 112.8 |
2025-02 | 117.0 | 117.3 | 113.2 | 118.0 | 113.1 |
2025-01 | 117.1 | 117.3 | 113.0 | 118.1 | 112.3 |
2024-12 | 116.3 | 117.2 | 112.8 | 114.5 | 113.7 |
2024-11 | 116.2 | 117.3 | 112.6 | 113.1 | 112.8 |
2024-10 | 116.3 | 117.1 | 112.4 | 112.0 | 112.3 |
2024-09 | 116.9 | 117.7 | 112.3 | 111.0 | 111.5 |
2024-08 | 117.3 | 117.6 | 112.6 | 114.9 | 115.1 |
2024-07 | 117.1 | 117.4 | 112.3 | 119.0 | 114.4 |
2024-06 | 117.4 | 117.3 | 112.0 | 117.7 | 112.9 |
2024-05 | 117.8 | 117.8 | 111.9 | 119.2 | 112.6 |
2024-04 | 117.4 | 117.0 | 111.7 | 123.4 | 112.5 |
2024-03 | 117.7 | 117.5 | 111.7 | 124.0 | 111.8 |
2024-02 | 118.3 | 118.1 | 111.8 | 125.6 | 112.1 |
2024-01 | 118.2 | 118.0 | 111.5 | 120.6 | 111.2 |
2023-12 | 117.8 | 118.3 | 111.4 | 122.1 | 112.2 |
2023-11 | 118.0 | 118.6 | 111.3 | 126.6 | 111.2 |
2023-10 | 118.3 | 118.8 | 111.4 | 131.5 | 112.4 |
2023-09 | 118.6 | 119.7 | 111.5 | 132.9 | 111.6 |
2023-08 | 119.0 | 119.3 | 111.4 | 127.7 | 113.6 |
2023-07 | 118.6 | 119.5 | 111.1 | 118.3 | 113.9 |
2023-06 | 120.1 | 120.8 | 111.2 | 117.3 | 111.9 |
2023-05 | 120.6 | 120.8 | 110.9 | 116.4 | 111.9 |
2023-04 | 120.7 | 120.7 | 110.9 | 124.5 | 111.9 |
2023-03 | 121.3 | 121.3 | 110.7 | 127.2 | 110.7 |
2023-02 | 120.5 | 120.9 | 110.4 | 128.2 | 110.5 |
2023-01 | 118.0 | 120.3 | 109.6 | 132.2 | 109.0 |
2022-12 | 114.5 | 117.9 | 108.4 | 123.2 | 109.7 |
2022-11 | 115.2 | 118.3 | 108.4 | 130.0 | 108.6 |
2022-10 | 115.8 | 117.8 | 108.1 | 129.7 | 108.1 |
2022-09 | 116.4 | 117.6 | 107.8 | 120.7 | 107.4 |
2022-08 | 118.1 | 117.7 | 108.2 | 129.5 | 109.8 |
2022-07 | 117.3 | 117.5 | 107.9 | 138.5 | 109.7 |
2022-06 | 116.9 | 116.2 | 107.2 | 144.5 | 106.4 |
2022-05 | 116.5 | 115.0 | 106.5 | 131.4 | 105.1 |
2022-04 | 114.0 | 113.1 | 105.6 | 129.2 | 104.6 |
2022-03 | 110.4 | 110.4 | 104.4 | 139.5 | 102.7 |
2022-02 | 109.0 | 108.8 | 103.6 | 118.8 | 102.7 |
2022-01 | 107.7 | 107.7 | 102.9 | 112.6 | 101.7 |
2021-12 | 104.1 | 105.3 | 101.7 | 106.8 | 101.6 |
2021-11 | 104.0 | 105.0 | 101.6 | 109.0 | 101.1 |
2021-10 | 103.4 | 104.1 | 101.3 | 107.9 | 100.7 |
2021-09 | 102.9 | 103.1 | 100.9 | 101.4 | 100.3 |
2021-08 | 102.3 | 102.2 | 100.7 | 100.2 | 101.6 |
2021-07 | 101.5 | 101.2 | 100.3 | 100.8 | 101.5 |
2021-06 | 99.3 | 99.3 | 99.4 | 98.9 | 100.0 |
2021-05 | 97.8 | 97.5 | 99.1 | 97.2 | 99.4 |
2021-04 | 97.3 | 96.5 | 99.0 | 96.1 | 98.5 |
2021-03 | 96.8 | 95.9 | 99.0 | 96.9 | 98.4 |
2021-02 | 95.9 | 95.4 | 98.7 | 94.1 | 98.6 |
2021-01 | 94.7 | 94.5 | 98.2 | 90.9 | 98.3 |
graphiqueProduction costs in buildings

- Source: INSEE.
tableauProduction costs in public works
Materials in civil engineering | Materials in specialised works | All public works | Machinery | Energy | Transport | |
---|---|---|---|---|---|---|
2025-06 | 116.7 | 118.8 | 115.9 | 117.0 | 115.5 | 114.0 |
2025-05 | 117.3 | 119.3 | 115.9 | 117.4 | 115.2 | 114.0 |
2025-04 | 119.0 | 119.7 | 116.4 | 117.2 | 120.5 | 114.0 |
2025-03 | 119.9 | 118.8 | 116.4 | 115.6 | 130.1 | 112.2 |
2025-02 | 119.8 | 119.6 | 116.9 | 115.9 | 135.6 | 112.2 |
2025-01 | 118.6 | 119.9 | 116.7 | 115.4 | 139.0 | 112.2 |
2024-12 | 117.6 | 116.9 | 115.4 | 116.0 | 128.4 | 112.7 |
2024-11 | 118.7 | 116.1 | 115.2 | 115.9 | 123.9 | 112.7 |
2024-10 | 115.4 | 116.7 | 114.2 | 116.1 | 118.2 | 112.7 |
2024-09 | 117.6 | 117.1 | 114.5 | 116.4 | 115.8 | 112.8 |
2024-08 | 120.3 | 117.7 | 115.2 | 116.5 | 115.8 | 112.8 |
2024-07 | 120.2 | 117.2 | 115.2 | 116.1 | 119.0 | 112.8 |
2024-06 | 119.3 | 117.6 | 114.8 | 116.1 | 119.2 | 112.1 |
2024-05 | 120.8 | 117.9 | 115.0 | 116.0 | 119.3 | 112.1 |
2024-04 | 119.8 | 119.4 | 115.3 | 116.1 | 127.0 | 112.1 |
2024-03 | 118.4 | 119.0 | 114.9 | 115.6 | 129.8 | 112.7 |
2024-02 | 117.0 | 119.6 | 114.8 | 115.3 | 133.2 | 112.7 |
2024-01 | 116.8 | 119.2 | 114.5 | 115.2 | 133.7 | 112.7 |
2023-12 | 117.0 | 117.2 | 113.8 | 115.4 | 134.7 | 110.0 |
2023-11 | 120.4 | 118.0 | 114.5 | 114.2 | 137.3 | 110.0 |
2023-10 | 123.4 | 117.6 | 115.2 | 114.5 | 134.9 | 110.0 |
2023-09 | 122.4 | 117.9 | 115.0 | 114.7 | 135.5 | 108.2 |
2023-08 | 119.7 | 117.9 | 113.9 | 114.1 | 127.5 | 108.2 |
2023-07 | 119.5 | 118.4 | 113.3 | 114.1 | 120.0 | 108.2 |
2023-06 | 119.2 | 119.7 | 113.0 | 113.6 | 118.4 | 107.8 |
2023-05 | 120.5 | 119.9 | 113.3 | 113.5 | 125.2 | 107.8 |
2023-04 | 119.4 | 120.9 | 113.7 | 113.9 | 136.0 | 107.8 |
2023-03 | 117.9 | 121.6 | 113.3 | 110.9 | 145.6 | 107.2 |
2023-02 | 116.8 | 121.8 | 112.8 | 110.5 | 145.3 | 107.2 |
2023-01 | 114.8 | 121.1 | 112.9 | 110.8 | 163.1 | 107.2 |
2022-12 | 113.7 | 116.8 | 111.3 | 109.0 | 158.1 | 106.8 |
2022-11 | 115.0 | 117.9 | 111.8 | 108.9 | 162.3 | 106.8 |
2022-10 | 114.9 | 118.2 | 112.5 | 108.9 | 181.5 | 106.8 |
2022-09 | 117.5 | 117.4 | 112.2 | 108.8 | 187.5 | 106.4 |
2022-08 | 118.9 | 118.4 | 112.5 | 108.3 | 182.0 | 106.4 |
2022-07 | 122.9 | 118.2 | 112.7 | 108.3 | 164.0 | 106.4 |
2022-06 | 124.7 | 118.5 | 112.5 | 105.2 | 164.2 | 104.6 |
2022-05 | 122.3 | 117.3 | 110.8 | 105.1 | 152.3 | 104.6 |
2022-04 | 121.3 | 114.2 | 110.6 | 105.3 | 163.7 | 104.6 |
2022-03 | 114.3 | 110.6 | 109.0 | 103.2 | 168.2 | 101.2 |
2022-02 | 110.0 | 108.6 | 105.9 | 103.4 | 139.2 | 101.2 |
2022-01 | 107.3 | 108.2 | 105.0 | 102.9 | 143.4 | 101.2 |
2021-12 | 105.4 | 103.0 | 103.0 | 101.6 | 130.4 | 101.2 |
2021-11 | 106.4 | 103.2 | 103.1 | 101.3 | 128.9 | 100.4 |
2021-10 | 104.2 | 102.7 | 102.3 | 101.2 | 119.8 | 100.4 |
2021-09 | 103.8 | 102.9 | 101.4 | 100.9 | 104.0 | 100.4 |
2021-08 | 102.7 | 102.5 | 100.8 | 100.5 | 97.2 | 100.5 |
2021-07 | 101.4 | 101.1 | 100.3 | 100.6 | 94.7 | 100.5 |
2021-06 | 98.7 | 99.6 | 99.4 | 100.1 | 91.1 | 100.5 |
2021-05 | 97.7 | 98.2 | 98.7 | 99.6 | 88.6 | 99.5 |
2021-04 | 97.5 | 97.5 | 98.7 | 100.1 | 86.9 | 99.5 |
2021-03 | 95.9 | 97.1 | 98.5 | 99.9 | 88.2 | 99.5 |
2021-02 | 93.9 | 96.4 | 97.3 | 97.1 | 87.3 | 98.8 |
2021-01 | 92.4 | 95.7 | 96.6 | 97.1 | 83.0 | 98.8 |
graphiqueProduction costs in public works

- Source: INSEE.
Revision
For the first quarter of 2025, the quarterly change in the construction production cost index, published in June 2025, has been revised downwards by 0.1 points to +0.8%, instead of +0.9%; its annual change is unchanged (+1.5%).
For further information
Monthly production cost indices are released every three months.
These indices aggregate the cost indices of six or seven factors of production: capital, labour, energy, materials, services, transport and wastes (only for public works).
These indices are subject to revision. They are primarily used as inputs for the national accounts and macroeconomics analyses.
Next issue: end of December 2025.
Documentation
Pour en savoir plus
Monthly production cost indices are released every three months.
These indices aggregate the cost indices of six or seven factors of production: capital, labour, energy, materials, services, transport and wastes (only for public works).
These indices are subject to revision. They are primarily used as inputs for the national accounts and macroeconomics analyses.
Next issue: end of December 2025.
Time series: Producer costs indices for construction
Informations Rapides: Labour cost index (LCI) – Detailed results