2015- n° 214In the second quarter of 2015, dwellings maintenance and improvement work price index
was virtually flat (+0.1%) Dwellings maintenance and improvement price index - 2nd quarter 2015
In the second quarter of 2015, dwellings maintenance and improvement work price index (IPEA) was virtually stable (+0.1% after +0.2% in the previous quarter). Over a year, it rose by 0.5%.
In the second quarter of 2015, dwellings maintenance and improvement work price index (IPEA) was virtually stable (+0.1% after +0.2% in the previous quarter). Over a year, it rose by 0.5%.
In the second quarter, prices were flat or virtually flat in the different kinds of works, except in heat and air-conditioning installation, in metal joinery works and ironwork and in plastering where they increased slightly(+0.2%).
Producer cost index in specialised construction in existing buildings (ICP-43BTR) was virtually flat in the second quarter of 2015 (+0.1%), and increased by 0.8% over a year.
tableauTABIPEA – Dwellings maintenance and improvement price and cost index (IPEA and ICP 43BTR)
Weights | 2015Q2 | Q/Q-1 | Q/Q-4 | |
---|---|---|---|---|
Dwellings maintenance and improvement work price index (IPEA) | 1 000 | 106.0 | + 0.1 | + 0.5 |
Masonry works and building structural works | 169 | 104.4 | + 0.0 | + 0.2 |
Painting and floor and wall covering | 169 | 102.7 | 0.0 | - 0.2 |
Wood and PVC joinery works | 155 | 109.1 | + 0.1 | + 1.4 |
Heat and air-conditioning installation | 107 | 107.9 | + 0.2 | + 0.2 |
Plumbing | 101 | 110.7 | + 0.1 | + 0.6 |
Roofing activities | 94 | 104.4 | + 0.0 | + 0.0 |
Electrical installation | 92 | 104.6 | + 0.0 | + 0.4 |
Metal joinery works and ironwork | 63 | 108.3 | + 0.2 | + 1.4 |
Plastering | 50 | 102.4 | + 0.2 | + 0.9 |
Producer cost index in specialised construction in existing buildings (ICP 43BTR) | 1 000 | 105.5 | + 0.1 | + 0.8 |
- In %, raw data, weights and reference 100 in 2010
- Source: INSEE
tableau – Revision of each dwellings maintenance and improvement work price indices (in points)
2015Q1 | |
---|---|
IPEA | /// |
Masonry works and building structural works | - 0.1) |
Painting and floor and wall covering | - 0.1 |
Wood and PVC joinery works | - 0.2 |
Heat and air-conditioning installation | + 0.1 |
Plumbing | + 0.2 |
Roofing activities | /// |
Electrical installation | + 0.1 |
Metal joinery works and ironwork | /// |
Plastering | /// |
- How to read it: the change of the “masonry works and building structural works” price index between the fourth quarter of 2014 is revised downward by 0.1 points. Published in May 2015 at 0.0% it is now estimated at –0.1%.
- Source: INSEE
graphiquegraphipeaUK – Dwellings maintenance and improvement price and cost indices (IPEA and ICP 43BTR)
graphiqueGraphFamilleUK – Contributions of in dwellings maintenance and improvement price indices during the second quarter of 2015 (%)
graphiqueGraph6aUK – Changes in main dwellings maintenance and improvement price index (I)
graphiqueGraph6bUK – Changes in main dwellings maintenance and improvement price index (III)
graphiqueGraph6cUK – Changes in main dwellings maintenance and improvement price index (II)
Documentation
Methodology (pdf,93 Ko)