Informations rapides
31 August 2015
2015- n° 214
In the second quarter of 2015, dwellings maintenance and improvement work price index was virtually flat (+0.1%) Dwellings maintenance and improvement price index - 2nd quarter 2015

In the second quarter of 2015, dwellings maintenance and improvement work price index (IPEA) was virtually stable (+0.1% after +0.2% in the previous quarter). Over a year, it rose by 0.5%.

In the second quarter of 2015, dwellings maintenance and improvement work price index (IPEA) was virtually stable (+0.1% after +0.2% in the previous quarter). Over a year, it rose by 0.5%.

In the second quarter, prices were flat or virtually flat in the different kinds of works, except in heat and air-conditioning installation, in metal joinery works and ironwork and in plastering where they increased slightly(+0.2%).

Producer cost index in specialised construction in existing buildings (ICP-43BTR) was virtually flat in the second quarter of 2015 (+0.1%), and increased by 0.8% over a year.

TABIPEADwellings maintenance and improvement price and cost index (IPEA and ICP 43BTR)

Dwellings maintenance and improvement price and cost index (IPEA and ICP 43BTR)
Weights 2015Q2 Q/Q-1 Q/Q-4
Dwellings maintenance and improvement work price index (IPEA) 1 000 106.0 + 0.1 + 0.5
Masonry works and building structural works 169 104.4 + 0.0 + 0.2
Painting and floor and wall covering 169 102.7 0.0 - 0.2
Wood and PVC joinery works 155 109.1 + 0.1 + 1.4
Heat and air-conditioning installation 107 107.9 + 0.2 + 0.2
Plumbing 101 110.7 + 0.1 + 0.6
Roofing activities 94 104.4 + 0.0 + 0.0
Electrical installation 92 104.6 + 0.0 + 0.4
Metal joinery works and ironwork 63 108.3 + 0.2 + 1.4
Plastering 50 102.4 + 0.2 + 0.9
Producer cost index in specialised construction in existing buildings (ICP 43BTR) 1 000 105.5 + 0.1 + 0.8
  • In %, raw data, weights and reference 100 in 2010
  • Source: INSEE

Revision of each dwellings maintenance and improvement work price indices (in points)

Revision of each dwellings maintenance and improvement work price indices (in points)
2015Q1
IPEA ///
Masonry works and building structural works - 0.1)
Painting and floor and wall covering - 0.1
Wood and PVC joinery works - 0.2
Heat and air-conditioning installation + 0.1
Plumbing + 0.2
Roofing activities ///
Electrical installation + 0.1
Metal joinery works and ironwork ///
Plastering ///
  • How to read it: the change of the “masonry works and building structural works” price index between the fourth quarter of 2014 is revised downward by 0.1 points. Published in May 2015 at 0.0% it is now estimated at –0.1%.
  • Source: INSEE

graphipeaUKDwellings maintenance and improvement price and cost indices (IPEA and ICP 43BTR)

  • Source: INSEE

GraphFamilleUKContributions of in dwellings maintenance and improvement price indices during the second quarter of 2015 (%)

Graph6aUKChanges in main dwellings maintenance and improvement price index (I)

  • Raw data, base and reference 100 in 2010
  • Source: INSEE

Graph6bUKChanges in main dwellings maintenance and improvement price index (III)

  • Raw data, base and reference 100 in 2010
  • Source: INSEE

Graph6cUKChanges in main dwellings maintenance and improvement price index (II)

  • Raw data, base and reference 100 in 2010
  • Source: INSEE